Projects | Remote Renovation Services NT
Bonya School
Bonya, NT  ยท  4 Project Visits
4 Visits
Bonya School

Internal and External Painting

Complete recoat of building exterior to provide a environment that students and staff are proud of. Durable Dulux coatings will withstand the harsh climate and remains easy to keep clean.

Surface Prep Rust Removal Damage Repair
Before After
Before
After

More From This Visit

Exterior painting
Exterior painting
Surface preparation
Surface preparation
Completed exterior
Completed exterior
Bonya School

Hybrid Flooring

Commercial hybrid flooring installation throughout all classrooms, admin block and school accomodation unit. Replacing dated and damaged yellow vinyl.

Hybrid Flooring Sub-floor Prep
Before After
Before
After

More From This Visit

Flooring install
Hybrid plank installation
Sub-floor prep
Sub-floor preparation
Completed floor
Completed classroom floor
Bonya School

Bathroom Replacement

Full replacement of four school bathrooms from dated vinyl to modern tiles and fixings. Including new showers and ablution area for students, and school visitor accomodation unit.

Demolition Tiling Showers Toilets Vanities
Bonya School bathroom before renovation, Northern Territory Bonya School bathroom after renovation, Northern Territory
Before
After

More From This Visit

Bathroom tiling
Bathroom tiling
New fixtures
New fixtures
Completed bathroom
Completed bathroom
Bonya School

Decorative Wall Panels

Installation of V groove wall panels and Autex pin boards to replace old and damaged classroom wall linings. Alongside Domino black feature walls to student lunchroom and admin block.

V Groove Wall Panels Autex Pin Boards Feature Walls
Before After
Before
After

More From This Visit

Wall panels
V groove wall panels
Autex pin boards
Autex pin boards
Feature wall
Domino black feature wall
Finke School
Finke, NT  ยท  2 Project Visits
2 Visits
Finke School

Hybrid & Vinyl Flooring Installation

Flooring replacement across classrooms and common areas. Hybrid planks installed in high-traffic zones with commercial vinyl sheeting in classrooms. Extensive sub-floor levelling completed prior to installation.

Hybrid Flooring Vinyl Flooring Concrete Grinding Sub-floor Prep Transition Strips
Before After
Before
After

More From This Visit

Flooring install
Hybrid plank installation
Vinyl corridor
Vinyl flooring, corridor
Finished classroom
Completed classroom floor
Finke School

Exterior Painting

Full exterior surface preparation and repaint of all buildings. Rust removal, damage repair and UV-resistant coating system applied throughout.

Exterior Painting Surface Prep Rust Removal Damage Repair
Before After
Before
After

More From This Visit

Ablution block
Ablution Block
Classroom block
Classroom Block
Admin block
Admin Block
Urapunga School
Urapunga, NT  ยท  2 Project Visits
2 Visits
Urapunga School

Exterior Repair & Full Repaint

Exterior repair and repaint completed during an active school term. After-hours scheduling ensured staff and students experienced no disruption. Full surface preparation, rust treatment and a UV-resistant coating system applied throughout.

Exterior Painting Exterior Repair Surface Prep Rust Treatment
Before After
Before
After

More From This Visit

Exterior painting
Exterior painting
Exterior painting
Exterior painting
Exterior painting
Exterior painting
Titjikala School
Titjikala, NT  ยท  2 Project Visits
2 Visits
Titjikala School

Vinyl Flooring & Carpet Tiles

Commercial-grade vinyl flooring with professional transition strips into carpet tiles across all classrooms.

Vinyl Flooring Carpet Tiles Transition Strips Sub-floor Prep
Before After
Before
After

More From This Visit

Vinyl detail
Vinyl flooring detail
Carpet tiles
Carpet tile installation
Transition strip
Transition strip finish

Get a Quote

Tell us about your site. We'll come back with a fixed quote.

Request Quote